
We will fully supply high-strength glass insulators specially matched for this 220kV overhead transmission line, core components to secure stable insulation and safe operation of the backbone high-voltage grid, effectively lifting cross-regional power transmission reliability. The formal contract was formalised through joint signing with the senior engineering management team of Sonelgaz.
This important project milestone demonstrates our consistent dedication to supplying reliable overhead transmission key components and solidifying long-term cooperative ties with Guinea’s national energy operator Sonelgaz.